QUICK RENDER PM100 HIGH BUILD
BASE COATS, CEMENT RENDERS, EXTERIOR
Rockcote Quick Render PM100 High Build is a pre-blended polymer-modified cement render. It is simple to mix and easy to apply. PM100 High Build has been formulated to build up and level undulating clay and cement block masonry and can be built out to 30mm.
Features
- Easy to use
- Excellent adhesion to properly prepared substrates
- Acrybond not required, just add water
- Manufactured with low density materials
- Environmentally responsible (consists of approx 50% post consumer waste)
- Insulative properties
- Fibre reinforced
- Lighter in weight than standard renders
Benefits
- Can be built up to 30mm thick
- Water repellent
- Can be overcoated after a minimum of 48 hours (site mix sand and cement must cure for a minimum of 28 days prior to coating).
- Saves time and money
- Can save scaffold costs when used instead of site mix sand and cement render.
- Increased insulation
- Extra crack resistance
Uses
This product has been formulated and designed to build up and level undulating clay and cement block masonry and expanded polystyrene foam and can be built up to a thickness of between 5mm to 30mm in a single coat. ROCKCOTE Quick Render PM100 High Build is ideal for a levelling base coat before the application of ROCKCOTE Coloured Renders and textures. Suitable for both interior and exterior use, Quick Render PM100 High Build adheres well to standard and difficult masonry substrates such as bricks, concrete blocks, AAC panel, off-form concrete and specified lightweight building substrates, such as core filled fibre cement sheet when properly prepared. Please refer to the ROCKCOTE Systems Guide for all suitable substrates.
Coverage Rate: 1.3m2/12kg bag @ 10mm build
Approximately 1.3 square metres per 12kg bag @ 10mm build.
Drying Time: 48 hours
Curing Time: 48-72 hours
- Dries in approximately 48 hours under normal drying conditions. (Dry times may vary with changes in temperature, humidity and residual moisture in the substrate.
- PLEASE NOTE THAT A 20 to 30mm THICK COAT NEEDS EXTRA TIME TO CURE & DRY OUT BEFORE TEXTURING CAN COMMENCE).
Once initial dry set has occurred, rewet 1 to 2 times a day with clean water for 2 days. This is especially important during hot and/or windy weather.
Packaging Sizes: 12Kgs